Skip to content

Ten years in the trade · Licensed and insured in Washington · (000) 000-0000

Electrician Lake Forest Park

New builds

New Construction Wiring in Lake Forest Park

Mostly tear-downs and infill here, and both reward sizing the service for the next thirty years.

An aerial view of a timber-framed house under construction

The whole scope, one crew

New building in a city this size is usually a rebuild on an existing lot. That has one useful consequence: the old service is right there to learn from, and you get to size the new one for how the house will actually be used. Sloped, wooded lots add their own work: a longer service entrance, exterior runs to a detached garage, and site lighting that has to be planned rather than added at the end. We are licensed, bonded and insured in Washington, and we take the whole scope — temporary power, service entrance, rough-in, inspections, trim — so there is one figure, one crew and one set of dates.

What is included

Temporary power and the service entrance

Power on site when the trades need it, permanent service established with the utility.

A full rough-in

Every circuit run, boxes set, lighting layout walked with you before anything is covered.

Inspection management

Rough and final inspections filed and attended.

Final trim and handover

Devices, plates and fixtures, tested, panel labelled, paperwork handed over.

Where we fit in

Plans at permit stage

The best moment to involve us; decisions cost nothing to change now.

Framing complete

Rough-in slots into the window between framing and insulation.

Several trades on site

We work to the construction schedule and tell your builder directly if anything moves.

An owner-built project

We are used to owners running their own build and will flag the early decisions.

How the work runs

01

Price the plans

A full scope and a fixed figure from the drawings.

02

Temporary and service

Site power early, permanent service coordinated.

03

Rough-in and inspect

Run, walked with you, inspected before close-up.

04

Trim and hand over

Fixtures and devices at the end, tested and documented.

Questions about this work

Do you work with our general contractor?

Yes, and most new-build work arrives that way.

Can we change the lighting after rough-in?

Small changes sometimes; anything structural is far cheaper before.

Should we allow for a charger?

On a lot with a detached garage, strongly. Putting conduit in during the build costs very little and retrofitting it costs a great deal.

Price the electrical on your build

Send the drawings or call. The quote and the planning conversation are free.